10 TPD CBG Commercial Project
Price 15000000 INR/ Piece
10 TPD CBG Commercial Project Specification
- Product Type
- CBG (Compressed Biogas) Commercial Plant
- General Use
- Commercial Biogas Production and Bottling
- Material
- Stainless Steel, Mild Steel
- Type
- Continuous Feed Anaerobic Digestion
- Capacity
- 10 TPD (Tons Per Day)
- Computerized
- Yes
- Automatic
- Yes
- Control System
- PLC Based SCADA System
- Cooling System
- Water-Cooled
- Purity(%)
- >96% (CH4)
- Production Rate
- ~500-600 Nm3 CBG per day
- Dew Point
- -10C to -20C
- Air Consumption
- Approx. 2500-3000 Nm3/hr (Biogas)
- Pressure
- 7 bar - 15 bar
- Power Consumption
- 120 kW - 150 kW
- Weight (kg)
- Approx. 85,000 kg
- Voltage
- 415 V, 3 Phase, 50 Hz
- Dimension (L*W*H)
- 45 m x 18 m x 11 m
- Feature
- Skid Mounted, Modular Design, Remote Monitoring Enabled
- Color
- Industrial Grey & Blue
- Biogas Upgrading Technology
- PSA (Pressure Swing Adsorption) / Water Scrubbing
- Safety Features
- Gas Leak Detector, Flame Arrestor, Emergency Shutdown
- Environment Compliance
- Meets CPCB and NGT Standards
- Startup Time
- 45 - 60 days for commissioning
- Operation Mode
- 24 x 7 Continuous
- Digestate Output
- 5-6 TPD (Solid and Liquid Fertilizer)
- CBG Compression Pressure
- ~200 Bar (for Bottling)
- Manpower Requirement
- 5-8 Operators per shift
- Utility Requirements
- Water, Electricity, Feedstock Supply
- Feedstock Type
- Agro Waste, Food Waste, Municipal Solid Waste, Organic Waste
- CBG Storage
- High-Pressure Cylinder Cascade/Buffer Storage
10 TPD CBG Commercial Project Trade Information
- Minimum Order Quantity
- 1 Piece
- Payment Terms
- Cash in Advance (CID), Cheque, Telegraphic Transfer (T/T)
- Supply Ability
- 10 Pieces Per Month
- Delivery Time
- 10 Days
About 10 TPD CBG Commercial Project
Ideal Applications and Users for 10 TPD CBG Commercial Project
The 10 TPD CBG Commercial Project is suitable for industrial power producers, municipal authorities, and agro-industrial companies needing sustainable fuel alternatives. Regularly used by manufacturers, service providers, and waste management agencies, this project finds application in biogas bottling, renewable energy supply, and organic fertilizer production, maximizing resource recovery from various waste streams. Its continuous feed operation and modular design offer seamless integration into commercial-scale sustainability initiatives and community-based energy hubs.
Packing, Dispatch, and Certification Assurance for 10 TPD CBG Project
We ensure premium quality through robust packing & dispatch methods and secure shipping via recognized freight partners from the designated FOB Port in India. The system is delivered complete with all necessary certificates ensuring conformity with CPCB and NGT norms. Our sample policy facilitates client inspections and testing before dispatch, offering peace of mind. Each unit is supported by technical documentation, best-in-class after-sales support, and thorough quality certification for reliable, long-term commercial use.
FAQ's of 10 TPD CBG Commercial Project:
Q: How is the 10 TPD CBG Commercial Project operated and monitored?
A: The system operates continuously (24x7) with automated controls via a PLC-based SCADA system, allowing remote management and real-time monitoring of all processes and safety features.Q: What types of feedstock can be used in this CBG project?
A: This commercial plant is suitable for a wide range of feedstocks, including agro waste, food waste, municipal solid waste, and organic waste, making it versatile for different regional and operational needs.Q: Where does the packing and shipping of the project take place?
A: Packing and secure shipping occur at the designated FOB Port in India. The project is delivered with all safety measures, certifications, and documentation for hassle-free installation.Q: What safety features are integrated into the project?
A: Exceptional safety measures are built-in, such as gas leak detectors, flame arrestors, and emergency shutdown systems, to ensure reliable and safe operations around the clock.Q: When can the plant begin producing CBG after installation?
A: Commissioning requires approximately 45 to 60 days, after which continuous biogas production and bottling can commence, ensuring a swift and efficient startup for commercial operations.
Price:
- 50
- 100
- 200
- 250
- 500
- 1000+
More Products in Biogas Plant Category
3TPD CBG Plant
Price 85000000 INR / Piece
Minimum Order Quantity : 1 Piece
Feature : Other, Skid Mounted, Modular Design, Fully Automatic Operation
Power Consumption : 90110 kW
Air Consumption : Approx. 25 m3/hr
Cooling System : Other, Water Cooled
12000 m3 Natural Biogas Purification Plant
Price 180000000 INR / Piece
Minimum Order Quantity : 1 Piece
Feature : Other, Skid Mounted, Modular Design, Low Operating Cost, EcoFriendly
Power Consumption : 4060 kW
Air Consumption : Approx. 20 Nm3/hr
Cooling System : Other, Chiller based water cooling
18000 M3 Commercial Biogas Plant
Minimum Order Quantity : 1 Piece
Feature : Other, High Gas Yield, Automated Control, High Durability
Power Consumption : 30 40 kW/hr
Air Consumption : Negligible
Cooling System : Water Cooling
30000 M3 Compressed Biogas Plant
Minimum Order Quantity : 1 Piece
Feature : Other, High Efficiency, EcoFriendly, Robust Construction
Power Consumption : 120200 kW
Air Consumption : As per Design
Cooling System : Other, Water Cooled
![]() |
Bhadauria Natural Gas And Products Pvt Ltd
All Rights Reserved.(Terms of Use) Developed and Managed by Infocom Network Private Limited. |
English
Spanish
French
German
Italian
Chinese (Simplified)
Japanese
Korean
Arabic
Portuguese




Send Inquiry




