3TPD CBG Plant
Price 85000000 INR/ Piece
3TPD CBG Plant Specification
- Product Type
- CBG Plant
- General Use
- Bio-CNG/CBG Production from Biogas
- Material
- Other
- Type
- Biogas Purification & Bottling Unit
- Capacity
- 3 TPD (Ton per Day)
- Computerized
- Yes
- Automatic
- Yes
- Cooling System
- Water Cooled
- Purity(%)
- >95% Methane
- Production Rate
- ~120 Nm3/Hr CBG Output
- Dew Point
- -60C
- Air Consumption
- Approx. 25 m3/hr
- Pressure
- 0.4-0.8 Mpa
- Power Consumption
- 90-110 kW
- Weight (kg)
- 28000
- Voltage
- 380V/415V, 3 Phase, 50 Hz
- Dimension (L*W*H)
- 15m x 8m x 6m (approx)
- Feature
- Skid Mounted, Modular Design, Fully Automatic Operation
- Color
- Green/White (Standard)
- H2S Removal
- <5 ppm
- Noise Level
- <70 dB at 1m Distance
- CO2 Removal
- <2%
- Safety Systems
- Automatic Shutdown, Gas Leakage Detection, Pressure Relief Valves
- Moisture Content After Drying
- <0.005 g/Nm3
- Feedstock Compatibility
- Cow Dung, Agricultural Residue, Food Waste, Municipal Waste
- Installation Time
- 30-45 Days
- Methane Recovery Efficiency
- >96%
- Outlet Pressure
- 200 Bar
- Gas Storage Type
- High Pressure Cascade System
- Operator Requirement
- 1-2 Operators per Shift
- Operational Temperature Range
- 5C to 45C
3TPD CBG Plant Trade Information
- Minimum Order Quantity
- 1 Piece
- Payment Terms
- Cash in Advance (CID)
- Supply Ability
- 10 Pieces Per Month
- Delivery Time
- 10 Days
3TPD CBG Plant About
Application and Usage Method for the 3TPD CBG Plant
The 3TPD CBG Plant is tailored for efficient biogas purification and compression at diverse sites including dairies, waste treatment plants, and agricultural units. With its modular, skid-mounted design, setup and commissioning are swift and straightforward. The plant processes various feedstocks-cow dung, municipal and food waste-using fully automatic, PLC-based operation. It is specifically used for the production and bottling of Bio-CNG/CBG intended for energy, transport, or industrial applications, maximizing resource utilization at the application site.
Delivery, Certification, and Export Markets for the 3TPD CBG Plant
The delivery time for the 3TPD CBG Plant is typically 30-45 days from confirmed order and proposal amount submission. Packaging is robust to ensure secure shipment and handling. This unit is supplied with major certifications as per industry and export norms, enhancing customer trust and quality assurance. The main export markets include Asia, Africa, and the Middle East, with rates and contracts tailored to wholesale, supply, and service requirements in these regions.
FAQ's of 3TPD CBG Plant:
Q: How does the 3TPD CBG Plant operate with different types of feedstock?
A: The plant can process a wide variety of feedstocks such as cow dung, agricultural residues, food waste, and municipal waste. It automatically adjusts to the input material, ensuring consistent methane recovery and efficient CBG production.Q: What are the specific benefits of using a high-pressure cascade system for gas storage?
A: A high-pressure cascade system allows for stable storage and easy dispensing of the compressed biogas, ensuring operational safety and maximizing storage efficiency at 200 Bar outlet pressure.Q: Where is the ideal location to install the 3TPD CBG Plant?
A: The plant is best installed at sites generating significant organic waste, such as farms, municipal waste facilities, or industrial processing centers. Its modular, skid-mounted design allows for flexible placement and reduced installation times.Q: What are the application methods for the plant's CBG output?
A: The Bio-CNG produced can be bottled directly on-site and used as a clean fuel for vehicles, industrial burners, or sold commercially for various energy applications, capitalizing on local and export market demands.Q: How does the plant ensure operational safety and environmental compliance?
A: It features automatic shutdown, gas leakage detection, and pressure relief valves, together with effective removal of H2S and CO2 to meet rigorous safety and emission standards.Q: When can customers expect delivery after placing an order?
A: Customers can expect plant delivery within 30-45 days following confirmation of order and acceptance of the proposal amount, depending on packaging and shipping logistics.
Price:
- 50
- 100
- 200
- 250
- 500
- 1000+
More Products in CBG Biogas Plant Category
12000 M3 Compressed Biogas CBG PLANT
Price 19.5 INR / Piece
Minimum Order Quantity : 1 Piece
Weight (kg) : Approx. 26000
Color : Green/Grey
Product Type : Compressed Biogas (CBG)
Production Rate : 24000 m3 per day
Commercial CBG Plant
Price 500000 INR / Piece
Minimum Order Quantity : 1 Piece
Weight (kg) : 20000 80000 (Approx, as per capacity)
Color : Standard Industrial Green/Grey
Product Type : Commercial CBG Plant
Production Rate : Up to 99% Methane Recovery
12000 m3 Natural CBG Biogas Purification Plant
Price 180000000 INR / Piece
Minimum Order Quantity : 1 Piece
Weight (kg) : 16000 kg
Color : Industrial Grey and Blue
Product Type : Biogas Purification Plant
Production Rate : Up to 500 Nm3/hr
18000M3 Natural Compressed CBG Biogas Plant
Price 280000000.0 INR / Piece
Minimum Order Quantity : 1 Piece
Weight (kg) : 16000 kg
Color : Green & Silver
Product Type : Natural Compressed Biogas Plant
Production Rate : 36000 Nm3/day
![]() |
Bhadauria Natural Gas And Products Pvt. Ltd.
All Rights Reserved.(Terms of Use) Developed and Managed by Infocom Network Private Limited. |
English
Spanish
French
German
Italian
Chinese (Simplified)
Japanese
Korean
Arabic
Portuguese





Send Inquiry



